A capex report tells an owner what capital work a property is likely to need, what it will cost, and when it should happen. Owners rely on it to turn a vague worry about aging roofs and boilers into a short list of decisions they can approve, and to set money aside before the work becomes urgent. That planning is harder going into 2027, because JLL now treats construction cost growth of 3% to 6% a year as the baseline instead of the exception, so last year’s unit costs may no longer hold. From there we’ll cover what to put in the report, how to separate capital spending from repairs, how to estimate and phase costs for 2027, and how to present the result.
What a Capex Report Is For
The report exists to support decisions. Owners use it to decide what to approve now, what to defer, and how much to hold in reserve, and lenders or investors may ask for the same information. Property managers use it to defend a budget and to show that the spending list came from evidence about the buildings, not from last year’s numbers plus a percentage. Keeping those readers in mind changes how you write it: a short summary on top, with the detail underneath.
What to Include
For each asset, the report should answer a handful of questions. What is it and where is it, whether that’s the roof over building B or the rooftop units on the east wing? What condition is it in, using one rating scale across the portfolio, and how do you know? Dated photos and the name of whoever took them settle that. How much life is left, what does the work cost, and in what year should it happen? Is it a life safety or code item, or can it wait? And who has to approve it?
A simple set of columns covers all of it: asset, location, condition rating, photo, remaining life, recommended action, estimated cost, year, priority, and approval status. Whether you keep that in a spreadsheet or in tools that capture condition ratings and photos on site, what matters is that the rating, the photo, and the cost stay attached to the same asset, so every number can be traced back to what was seen. If you want a closer look at how findings should be written up, our guide to writing up findings people will actually use goes through it.

Separate Capital Spending From Repairs
Before costs go into the report, each item needs a classification. Whether spending counts as capital or as a repair affects both the budget and the tax treatment. The IRS’s tangible property regulations page explains that spending may count as an improvement when it betters, restores, or adapts a property to a new use. Costs that don’t qualify as improvements may be deductible as repairs, depending on the circumstances. The same page describes a de minimis safe harbor of $2,500 per invoice or item, or $5,000 if the taxpayer has an applicable financial statement, which has to be elected on a timely filed return.
Your accountant makes the final call. The report’s job is to give them enough to work with: what was done, to which asset, and what it cost.
Estimating Costs for 2027
This is where last year’s numbers are most likely to mislead. JLL puts North American construction costs rising 3.2% to 4.2% in 2027, and it expects material prices to move 20% to 40% in either direction over the next three to five years. Its advice to owners is to lock in structure and mechanical, electrical, and plumbing pricing early, retest any pro forma built before 2024 against current benchmarks, and move priority projects forward before the 2027 increases take effect.
Those are construction-wide figures, so they won’t match any one building, but they’re a fair test of whether an old unit cost still belongs in your report. Multifamily operators are handling that gap by budgeting from the property level. In a Multifamily Dive report from October 12, Bell Partners said it builds budgets property by property and re-forecasts during the year.
For a capex report, that translates into a few habits. Get current quotes for the biggest items, note the date and source of each estimate, and refresh them when a quote expires. If a figure is a placeholder, say so in the report.

Phase the Work by Priority
Once the costs are in, sort the work by when it has to happen. Life safety and code items come first, followed by assets near the end of their life where a failure would cause damage or downtime, then planned replacements that can be scheduled, and finally upgrades that are optional. Operators are applying a similar filter. In Multifamily Executive’s look at 2027 budgets, Platte Canyon Capital said it renovates a unit only when deferred maintenance has to be fixed to make it leasable, and it is putting more dollars toward what its CEO called “realistic repair reserves.”
A phased schedule also lets you show an owner what happens if an item slides to next year. If you manage a community with association reserves, our post on reserve studies becoming a legal requirement for associations covers a related side of the same planning.
Presenting It to Owners
Lead with a one-page summary: total recommended spending by year, the handful of items that need a decision now, and what has already been approved or spent against budget. Behind it, put the full schedule with photos. Owners rarely read every line, but they will act on a clear list of decisions. Our piece on reporting on commercial property assets more broadly covers what boards and investors increasingly expect to see.

Keeping the Report Current
A capex report goes stale quickly if it only gets touched at budget time. Rating a few assets after each routine walk, logging new findings as they appear, and updating the status when work is approved or finished keeps the report close to the truth. Putting those walks on a schedule helps, and our guide to automating recurring inspections shows how to set that up. If you’re still sorting out which kind of software fits, our complete guide to how these tools work covers the whole category.
Tools That Help
A spreadsheet works for a handful of properties. As a portfolio grows, the case for software gets stronger: photos stay attached to the findings they show, ratings are consistent from property to property, and nothing depends on one person’s files. SnapInspect lets teams build their own checklists, capture timestamped photos on site, work offline, score assessments automatically, and track findings as tasks, with dashboards for results across properties. If you’d like to see how that could work for your capex reporting, you can book a demo.
Wrapping Up
A capex report is only as good as the information under it. Rate each asset consistently, attach the photos, sort spending into capital and repairs before you total it, date your cost estimates, and put the decisions on the first page. Do that and the 2027 budget conversation starts from evidence, which is a stronger position than defending a number from last year.